The government of India has set the target of achieving 100 GW of solar power capacity in the country by the year 2022 of which 40 GW is to be achieved from rooftop solar (RTS). Grid-Connected Rooftop Solar Program is an endeavor to achieve the cumulative capacity of 40,000 MW from Rooftop Solar Projects (RTS) by the year 2022.
Source: https://www.suprabha.org/